Project management and planning, Interface engineering design and Refurbishment of Power Systems and Substations

Archived Projects

Prenton, Burlington Street, Deeside and Dutton Grid Substations - 132/33kV Grid Transformer Replacements. At these sites full circuit design and interface engineering associated with the replacement of Grid Transformers and 132kV disconnectors. Including circuit and interface designs to match the intertripping/protection changes at the remote ends.Also included was the management of the panel build. St Helens and Formby Grid Substations - New Grid Transformers. For these sites full circuit design and interface engineering associated with the addition of new Grid Transformers, 132kV disconnectors and fault recorders.Including circuit and interface designs to match the intertripping and protection changes at both ends. Also included was the management of the panel build. Holway Road, Mersey Bridge and Sandon Dock Primary Substations - New Primary Substations. At these sites full circuit design and management of the panel build associated with the 33kV feeder and 33/11kV transformer protection and control panels. Also included was the management of the panel build Caergeillog 33kV Substation - Substation Extension. Full circuit design and interface engineering associated with the addition of a 33kV Feeder circuit with protection refurbishment of two existing 33kV feeders.